ATSEN post dated 07.09.2026

The process signal has not reached the threshold.
How do you check the relay outputs in the panel?

Hypothetical commissioning scenario: the indicator is installed, and the team needs to test the two controlled circuits before testing with a real signal.

PR 5714D from PR electronics allows each relay to be activated and deactivated independently of the input signal. The team can therefore check the outputs separately from changes in the measurement.

The four-digit LED display shows the measured value, while local indication shows the relay status. The input circuit is galvanically separated from the output and the power supply. Testing the outputs does not replace checking the thresholds with a real signal.

In your procedures, how do you separate output testing from threshold verification?

Details and availability:
PR 5714D

For resellers and integrators: the discount is activated manually after account creation, contact and confirmation of your status.

hashtag#ProcessInstrumentation hashtag#Commissioning hashtag#AlarmRelays hashtag#PanelIndicators

PR 5714D: testing relays before the threshold is reached — image 1

Source: ATSEN — LinkedIn